Skip to content
Back to All Government Schemes
Central Solar Agriculture & Power Scheme

PM-KUSUM Yojana 2026 – Up to 60% Solar Subsidy & 25-Year Guaranteed Income

Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (Components A, B & C)

PM-KUSUM Yojana is the flagship initiative of the Ministry of New and Renewable Energy (MNRE) enabling farmers, FPOs, and rural entrepreneurs to install standalone solar water pumps with 60% capital subsidy (30% Central + 30% State) and set up 500 kW to 2 MW grid-connected solar power plants on barren or agricultural land with guaranteed 25-year Power Purchase Agreements (PPA) with state DISCOMs.

Talk to Advisor
PM-KUSUM Yojana 2026 – Up to 60% Solar Subsidy & 25-Year Guaranteed Income Infographic
Eligibility Assessment

Who Can Apply?

Verified criteria and borrower eligibility guidelines set by the Government of India.

Individual Farmers

Farmers owning cultivable, barren, fallow, pasture or marshy land seeking solar irrigation pumps or power generation income.

Farmer Producer Organizations (FPOs)

Registered FPOs, farmer collectives, and primary agricultural credit societies (PACS) setting up shared solar energy assets.

Water User Associations (WUAs)

Rural water user associations and cooperative societies seeking solarized community pumping stations.

Gram Panchayats & Cooperatives

Village local bodies and rural cooperatives installing decentralized ground-mounted solar plants on community land.

Rural Agri-Entrepreneurs & Developers

Landowners, MSMEs, and project developers seeking to set up 500 kW to 2 MW solar power plants under Component A.

Grid-Connected Pump Owners

Farmers with existing electric agricultural connections converting to solar-powered feeder lines under Component C.

Program Highlights

Key Features

Core benefits, guarantees, and subsidy structures under this flagship program.

Component A: Solar Power Plants (0.5MW to 2MW)

Installation of decentralized, ground-mounted grid-connected solar power plants of capacity 500 kW to 2 MW within 5 km of 33/11 kV sub-stations with guaranteed feed-in tariffs.

Component B: Standalone Solar Pumps (up to 7.5 HP)

Installation of individual standalone solar-powered agriculture pumps of capacity up to 7.5 HP in off-grid areas with up to 60% government subsidy.

Component C: Feeder Level Solarisation

Solarisation of grid-connected agricultural pumps and agricultural feeders, allowing farmers to irrigate in daytime and sell surplus solar electricity back to the utility grid.

60% Combined Capital Subsidy

Central Financial Assistance (CFA) provides 30% subsidy and State Government contributes 30% subsidy. The farmer invests only 10%, with the remaining 30% funded via bank term loan.

25-Year Guaranteed Income PPA

State distribution utilities (DISCOMs) sign long-term 25-year Power Purchase Agreements (PPAs) to purchase generated solar power at pre-fixed tariffs.

End-to-End Growthora Facilitation

Growthora manages technical feasibility, DPR preparation, vendor selection, state nodal agency portal filings, DISCOM connectivity approvals, and bank loan syndication.

Advantages & Subsidies

Scheme Benefits

Up to 60% combined capital subsidy on standalone solar agriculture pumps.
Complete elimination of recurring diesel fuel costs and unpredictable power bills.
Guaranteed stable monthly income for 25 years by feeding surplus solar energy into the grid.
Reliable daytime solar electricity for agricultural irrigation without power cuts.
Low capital outlay with only 10% farmer equity and 30% institutional bank loan support.
Contribution to clean green energy, reduced carbon footprint, and enhanced rural income.
Step-by-Step Guide

Application Process

Step 01

Feasibility Assessment & Component Selection

Determine the suitable scheme component (A, B, or C), evaluate land area, water table depth, HP requirement, or proximity to nearest 33/11 kV DISCOM substation.

Step 02

DPR & Technical Documentation

Prepare the Detailed Project Report (DPR), single-line diagrams, land records verification, and financial viability model with Growthora's renewable energy team.

Step 03

State Nodal Agency (SNA) Application

Submit application on the official state renewable energy portal along with land records (7/12, Khasra), Aadhaar, bank details, and requisite processing fees.

Step 04

DISCOM Connectivity Approval & Vendor Installation

Obtain grid connectivity clearance from DISCOM. Empanelled MNRE-certified solar vendors supply, erect, and test the solar pump or power plant.

Step 05

Inspection, Net-Metering & Subsidy Disbursement

State Nodal Agency and DISCOM conduct joint physical commissioning and install bidirectional net-meters, releasing the subsidy directly.

Checklist

Documents Required

Keep the following paperwork ready for instant verification and fast processing.

Aadhaar Card, PAN Card, and Passport Photographs of Applicant
Land Ownership Documents (7/12 extract, Khasra, Khatauni, Jamabandi)
Bank Account Passbook / Cancelled Cheque for subsidy transfer
Electricity Connection Consumer ID & DISCOM Bills (for Component C)
Water Source Availability Certificate / Borewell Details
NOC from Gram Panchayat / Land Lease Agreement (if leasing land)
Detailed Project Report (DPR) for Component A (0.5 MW to 2 MW Solar Power Plants)
Got Questions?

Frequently Asked Questions

PM-KUSUM (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan) is a central government scheme launched by MNRE to provide subsidies for solar agricultural pumps and solar power generation plants across India.
Fast-Track Processing

Solarize Your Farm & Earn Steady Revenue with PM-KUSUM Yojana

Connect with Growthora's renewable energy and agricultural subsidy experts to get your solar pump and power plant approved seamlessly.

PM-KUSUM 2026: Eligibility & Solar Support | Growthora